282 Main Street store front remodel

282 Main Street store front remodel.
Concrete was poured under new walls to self level the areas.
Concrete was poured under new walls to self level the areas.

This store front remodeling project began with the demolition of two entire store front walls, windows, doors and soffits according to the plans from Joseph Mattei.

Our crew removed the existing masonry slab in front of doorways and installed a new concrete slab with a non-skid broom finish. They then installed concrete in the remaining areas under new walls to self level the areas.

New walls were then framed in and insulated. Outlets and exterior lighting was installed. Then interior and exterior finishes were applied, and new sloarban 60 Low E insulated glass and doors were installed. A highlight of the project are the custom-built raised panels adorning the exterior walls.

 

A highlight of the project are the custom-built raised panels adorning the exterior walls.
A highlight of the project are the custom-built raised panels adorning the exterior walls.